-
48 MWTotal nominal installed capacity
-
10+ yearsPowering the country
48 MW of wind power strengthening the Northeast’s energy matrix
Located in Serra do Mel, Rio Grande do Norte, the Junco Wind Complex comprises the Junco I and Junco II wind farms, each with an installed capacity of 24 MW, for a combined total of 48 MW.
Each wind farm is equipped with eight 3 MW wind turbines. Eletrobras Chesf, now AXIA Nordeste, holds a 49% ownership stake in the project, which has been in operation since 2015, contributing to the expansion of renewable energy generation across Northeastern Brazil.
